What Is A Drawdown Test?

by | Last updated on January 24, 2024

, , , ,

A pressure drawdown test is simply

a series of bottom-hole pressure measurements made during a period of flow at constant production rate

. Usually the well is closed prior to the flow test for a period of time sufficient to allow the pressure to stabilize throughout the formation, i.e., to reach static pressure.

What is drawdown in pumping test?

During a pumping test, water is pumped out of a well/bore over a period of time, at a controlled rate. As pumping occurs,

groundwater levels decline

(drawdown). When the pump is turned off, groundwater levels recover. … drawdown and recovery data is then used to estimate hydraulic properties of the aquifer.

What is a well drawdown test?

A well test is conducted

to evaluate the amount of water that can be pumped from a particular water well

. … When water is pumped from a well the water level in the well falls. This fall is called drawdown. The amount of water that can be pumped is limited by the drawdown produced.

What is the purpose of a step drawdown test?

A step-drawdown test (or step test) is a single-well pumping

test designed to investigate the performance of a pumping well under controlled variable discharge conditions

.

What is pressure buildup test?

1. n. [Well Testing]

The measurement and analysis of (usually) bottomhole pressure data acquired after a producing well is shut in

. Buildup tests are the preferred means to determine well flow capacity, permeability thickness, skin effect, and other information.

What is drawdown time?

A drawdown is a peak-to-trough decline during a specific period for an investment, trading account, or fund. A drawdown is usually quoted as

the percentage between the peak and the subsequent trough

.

How do you calculate a drawdown?

  1. D(T) = Drawdown Time.
  2. t = Peak.
  3. T = Trough.
  4. X = Variables.

What happens during drawdown?

In surface water hydrology and civil engineering, drawdown refers to the

lowering of the surface elevation of a body of water

, the water table, the piezometric surface, or the water surface of a well, as a result of the withdrawal or water.

What is drawdown level?

Drawdown is

the drop in level of water in a well when water is being pumped

. Drawdown measurements record the difference (in feet or meters) between the static level and the pumping level. Well yield. Well yield is the volume of water per unit of time that is. produced from the well by pumping.

What is drawdown in a pressure tank?

A tank’s drawdown volume is

the amount of water that is stored between a high and low pressure

, which is usually determined by a pump switch. In real-world plumbing systems, the tank should not start at the maximum pressure and the air cushion pressure should not fall to zero.

How do you do a step drawdown test?

In a step-drawdown test the well is initially pumped at a low constant rate until the drawdown within the well stabilises, i.e. until a steady state is reached. The pumping rate is then increased to a higher constant rate and the well is pumped until the drawdown stabilises once more (Figure 5.1).

How do you calculate water well drawdown?


Subtract the measurements you collect as the pump is running from the static water level

. The difference is the drawdown. For example, if the static water level is 1 foot below the top of the casing and the water level after one hour is 3 feet below the top of the casing, the drawdown at one hour of pumping is 2 feet.

What is the well efficiency?

Well efficiency has been defined in two main ways. First is one that equates well efficiency with well losses, either directly or indirectly. That is, a well is

more efficient as the various head losses caused by the well decrease

.

What are the types of well test?

Test types include

buildup, drawdown, falloff, injection and interference

. For most tests, engineers permit a limited amount of fluid to flow from or into a formation. They then close the well and monitor pressures while the formation equilibrates.

Where can pressure build up?

Definition – What does Pressure Buildup mean? Pressure Buildup is a practice of building up pressure in

oil or gas wells

so that liquids can come out to the surface through the wellbore.

What is Surface well testing?

As a reservoir/production engineer and to assess well performance we need to regularly test gas or oil wells at surface. The results will be used for flow rate

estimation

and to diagnose any problem the well is suffering or it is at the outset of any arising issue.

Ahmed Ali
Author
Ahmed Ali
Ahmed Ali is a financial analyst with over 15 years of experience in the finance industry. He has worked for major banks and investment firms, and has a wealth of knowledge on investing, real estate, and tax planning. Ahmed is also an advocate for financial literacy and education.