Cost Estimate (Union Labor) % of Total Cost | Total $10,050,000 | Contractor Fees (GC,Overhead,Profit) 25% $2,512,500 | Architectural Fees 6% $753,800 | Total Building Cost $13,316,300 |
---|
How much does it cost to build a 5 story building?
They have an average range of
between $7 – $12.5 million
.
How much does it cost to build an office building?
Building a single-story commercial office building will cost an average of
$238–$286 per square foot
. A mid-rise building costs $569 on the high end and $474 on the low end to construct. Building a high-rise will cost a high between $545–$654 per square foot on the low end.
How much does it cost to build a 10000 sq ft commercial building?
A 10,000 sq ft steel building cost for building only (aka “dropshipped”) will be
between $180,000 and $200,000
, but a number of things can affect the cost. Find out why 95% of new industrial construction uses steel buildings.
How much does it cost to build a 4 storey building?
Cost Estimate (Union Labor) % of Total Cost Per SF | Total $125.97 | Contractor Fees (GC,Overhead,Profit) 25% $31.49 | Architectural Fees 7% $11.02 | Total Building Cost $168.48 |
---|
How much does a 20000 square foot building cost?
Building Size (ft) Square Footage (SF) Estimate Cost | 80×100 8,000 $112,000 | 100×100 10,000 $120,000 | 100×200 20,000 $240,000 | 150×250 37,500 $450,000 |
---|
How do you estimate building costs?
Arriving at an exact figure for new home costs per square foot might not be realistic, but getting a ballpark idea should be possible. To do this, take the total cost of your project, as outlined by your builder, and
divide this by the total number of square feet in your project
.
How long does it take to build a commercial building?
For example, most commercial buildings that are more than 10,000 square feet will take somewhere between
4-6 months
to build. When you get up into more complex office buildings and larger industrial buildings, say 50,000 square feet or more, they can take from six to eight months.
What is average building cost per square foot?
The building cost per square foot for average-standard private homes in California ranges from $87.49 per sqft to $133.99 per sqft, with the
average being $103.17 per sqft
.
What is most expensive part of building a house?
Framing
is the most expensive part of building a house. While exact framing costs can sometimes be tricky to predict, there are general guidelines that can help you understand what will drive costs up. Size. The bigger the house, the more expensive it will be to frame.
How much does it cost to build a 30×40 house?
Item Quantity Price | Material 2541 sq [email protected] ₹ 82 per sq ft ₹2,03,280 | Labour 2541 sq [email protected] ₹52 per sq ft ₹1,27,050 | Total Price ₹ 3,30,330 |
---|
How much does it cost to build a 2000 sq ft brick house?
Total square footage Cost range | 1,200 $7,200- $18,000 | 1,500 $9,000 – $22,500 | 2,000 $12,000 – $30,000 | 2,500 $15,000 – $37,500 |
---|
Is it cheaper to build a metal building or wood?
Metal tends to be cheaper than wood
, with an average of $19-$25 per sq ft for a steel building and $20-$35 per sq ft for a wood building. Also, using metal in your build has a lower lifetime cost due to near-zero maintenance, and it can be nearly 100% salvaged and sold if it is ever torn down.
How much does it cost to build a 2500 square foot home?
Square footage Price range | 2,000 $200,000 to $400,000 | 2,500 $250,000 to $500,000 | 3,000 $300,000 to $600,000 |
---|