When Several Activities Need The Same Limited Resource At The Same Time The Activities With?

by | Last updated on January 24, 2024

, , , ,

In addition to showing the technical constraints among activities, how does the network logic also take into account resource constraints?

Activities that use the same resource may not be able to occur in parallel to each other

. In resource-limited scheduling, the lower priority activities get delayed.

How does the network logic also take into account resource constraints?

In addition to showing the technical constraints among activities, how does the network logic also take into account resource constraints?

Activities that use the same resource may not be able to occur in parallel to each other

. In resource-limited scheduling, the lower priority activities get delayed.

When several activities need the same limited resources at the same time the activities?

13. In resource-limited scheduling, when several activities need the same limited resource at the same time, activities with the least slack

have no priority

.

When several activities need the same limited resource at the same time the activities with the least slack have first priority group of answer choices?

Question Answer When several activities need the same limited resource at the same time, the activities with the _____ have first priority. least slack

Why would activities be drawn in a serial relationship in a network diagram?

some activities use the same resources that may not be available. Why are activities drawn in a serial relationship in a network diagram? …

The activities use different resources

.

When planning a project is it necessary to estimate?

– Estimates are needed

to develop time-phased budgets and establish the project baseline

. The quality of the estimate depends on the planning horizon, estimates of current events are close to 100 percent accurate but are reduced for more distant events.

Why slack or float time needs to be included in the project?

Slack, also called float, is

the amount of time a task can slip before it bumps into another task

. It’s automatically calculated into your project when you schedule tasks, and you can use it as buffer time if needed when your schedule is at risk of being delayed.

Does resource limited scheduling keep a project on schedule if so how?


Resource limited scheduling does not keep a project on schedule

. It may extend the schedule in order to keep within the resource limits.

What is the difference between resource smoothing and resource leveling?

Resource levelling is used when limits on the availability of resources are paramount. … Resource smoothing is used

when the time constraint takes priority

. The objective is to complete the work by the required date while avoiding peaks and troughs of resource demand.

What is leveling resources in project management?

Resource leveling is a

project management technique that involves resolving overallocation or scheduling conflicts to ensure a project can be completed with the available resources

. Resources include the time, materials, or tools needed to complete a project.

What is it called if resources are not adequate to meet peak demands?

If resources are not adequate to meet peak demands, the resulting reschedule is termed.

Resource-constrained scheduling

.

When considering the availability of resources it may be necessary to make some assumptions such as?

Transcribed image text: When considering the availability of resources, it may be necessary to make some assumptions, such as the

type of organizational structure of the sponsor the ability to hire additional individuals with the appropriate expertise in time

for when they will be required to work on a project.

What is a project resource?

Project resources are

the people, capital, and/or material goods required for the successful execution and completion of a project

. In a nutshell: project resources are what you depend on to get work done.

When the budgets for all the work packages are summed quizlet?

4. When the budgets for all the work packages are summed,

they cannot exceed the total project budgeted cost

.

Is the sum of the estimated costs of all the specific activities that make up a work package or the project?

Question Answer The ____ is the product of the percent complete and the sum of the estimated costs of all the specific activities that make up a work package or the project.

cumulative earned value (CEV)

When the CPI goes below 1.0 or gradually gets smaller?

When the CPI goes below 1.0 or gradually gets smaller,

corrective action should not be taken

, the project is performing well. The key to effective cost control is waiting to address negative cost variances and cost inefficiencies after they are identified. It is important to manage the cash flow on a project.

David Evans
Author
David Evans
David is a seasoned automotive enthusiast. He is a graduate of Mechanical Engineering and has a passion for all things related to cars and vehicles. With his extensive knowledge of cars and other vehicles, David is an authority in the industry.