How Long Does Poly Leveling Last?

How Long Does Poly Leveling Last? Despite these benefits, you may be left wondering how long does foam jacking last? While mudjacking usually lasts 2-5 years, polyurethane can last much longer if properly maintained. How much does Poly Lift cost? Polyjacking costs start at around $900 for a basic job up to $7,500 for extensive

How Much Is Concrete Per Square Foot In Fresno?

How Much Is Concrete Per Square Foot In Fresno? This Concrete Fresno Quote Includes: $3.00 to $3.00 per square foot material costs. Average labor costs to install concrete pads in Fresno, California. What is a fair price per square foot for concrete? Concrete slabs typically cost about $6 per square foot, or between $4 and