How The Hoover Dam Was Built?
How The Hoover Dam Was Built? The plan of attack was to drill four diversion tunnels through the canyon walls during the low-water season of 1932-33, divert the river through the tunnels, build earthen cofferdams above and below the dam site to block the river, de-water and excavate the site, and build the dam and