What is Capacity Requirements Planning CRP primarily used for? Capacity requirements planning (CRP) is
the process of discerning a firm’s production capacity and whether it can meet its production goals
.
Which of the following flows is most likely used in a flow environment that is supply constrained by the availability of a seasonal vegetable?
Which of the following flows is most likely used in a flow environment that is supply-constrained by the availability of a seasonal vegetable?
Forward flow
is used when there is a defined starting point or when work can only begin upon receipt of supply.
When capacity does not match the plan which of the following actions can be taken?
When capacity does not match the plan, which of the following actions can be taken? –
Provide sufficient capacity
.
Which of the following is a display of future capacity requirements based on released and or planned orders over a given span of time?
(
A load profile – also known as a load projection or load report
– is a display of future capacity requirements based on released and/or planned orders over a given span of time.)
How do you use capacity requirement planning?
- Measuring and forecasting aggregate demand.
- Identifying the different capacity plans required to meet forecast demand.
- Identification of the most suitable capacity plan to meet the aggregate demand given the organisations capacity constraints.
What is a result of an analysis of the capacity requirements planning CRP system?
Capacity requirements planning (CRP) is
the process of discerning a firm’s production capacity and whether it can meet its production goals
. Conducting a CRP analysis is a critical management tool, as it helps a company to know if it can meet the demand for its product.
Which step comes first after sales and operations planning?
Which of the following should come first in the
business planning process
? Sales and operations planning should come first in the business planning process. The output from the sales and operations process is the production plan. The production plan then provides input to the master production schedule.
What is an example of a food that changes form due to enzymatic reactions?
Some foods depend on enzymatic browning for the color normally associated with them. Examples include raisins,
unroasted coffee and cocoa beans
, and tea (Table 2.5). However, brown color is not desirable in foods such as lettuce and fruits because of its association with spoilage.
What term is used for the ratio of standard hours of work produced to hours actually worked?
The ratio of standard hours of work produced to hours actually worked is called: A) efficiency.
Which of the following is an element of manufacturing lead time?
One business dictionary defines “manufacturing lead time” as the
total time required to manufacture an item
, including order preparation time, queue time, setup time, run time, move time, inspection time, and put-away time.
When selecting and sequencing jobs that need to be processed at work stations the assignment of this work is called?
D) 310 minutes. The selection and sequencing of available jobs to be run at individual work stations and the assignment of these jobs to workers is called: A)
scheduling
.
What are the three types of capacity planning?
The three types of capacity planning based on goal are
lead capacity planning, lag strategy planning and match strategy planning
.
What is capacity planning with example?
On an assembly line in a car factory, for example, a
painting robot might be able to paint 10,000 cars in a day
. Considering this type of capacity is also important for workforce capacity planning; the workers on the assembly line are limited by the number of cars or parts a machine can process during a shift.
What is the process of capacity planning?
Capacity planning is the
process of determining the production capacity needed by an organization to meet changing demands for its products
. … IT capacity planning involves estimating the storage, computer hardware, software and connection infrastructure resources required over some future period of time.
What is CRP in capacity planning?
Capacity requirements planning (CRP) is
the process of specifying the level of resources
(facilities, equipment and labor force size) that best supports the enterprise’s competitive strategy for production.
What are the basic inputs to CRP process?
The major inputs for CRP process are:
Planned orders and released orders from MRP system
. 2. Loading information from the work centre status file. 3.