Here’s another comparison: Product scope completion is measured against
the product requirements
. Project scope completion is measured against the project management plan.
What does scope mean in product management?
The product scope is defined by the
features and functions that characterize a product, service, or result
. It is the result of the project or the solution to the problem. The product could be an entire new system, an enhancement to an existing system, or a defect fix.
What is product scope measured against?
Answer and Explanation: The correct answer is A. According to the PMBOK Guide: “Completion of the project scope is measured against the Project Management Plan. Completion of the product scope is measured against
the product requirements
.”
What is product scoping?
Product scope can be defined as
the features or characteristics of a product itself
. Whether considering design, function or component parts, the key point is that product scope refers to the actual tangible product. … Product scope does not have to refer to goods.
What is a product scope Mcq?
Product scope” is best defined as which of the following: A.
The features and functions that characterize a product, service, or result
. B. The work performed to deliver a product, service, or result with the specified features and functions.
How do you write a product scope?
- 3 Steps to Define a Product Scope. Lay the foundations of your product. …
- Step 1: Lay the Foundations of Your Product. …
- Step 2: Define and Prioritize Features. …
- Step 3: Define the Minimum Viable Product (MVP)
What is the scope baseline in project management?
As PMBOK notes, scope baseline “is
the approved version of a scope statement, WBS, and its associated WBS dictionary”
. These elements can only be modified through a formal change control process.
Why do we manage scope?
Scope management
ensures a project’s scope is accurately defined and mapped and enables project managers to allocate the proper labor and costs necessary to complete the project
. This is primarily concerned with what is and is not part of the scope.
What is product scope example?
According to the PMBOK Guide, sixth edition, product scope is the features and functions that characterize a product, service, or result. For example, if
the product is a bridge
, the product scope might be its length, width, and load strength.
What is scope creep in project management?
Scope creep (sometimes known as “requirement creep” or even “feature creep”) refers
to how a project’s requirements tend to increase over a project lifecycle
, e.g., what once started as a single deliverable becomes five; or a product that began with three essential features, now must have ten; or midway through a …
What is the difference between project and product scope?
The Difference Between Project Scope and Product Scope
The project scope is
the work that is required to deliver the product
. … The product scope focuses on the features of the end product and the project scope focuses on the work needed to deliver the product.
What does scope mean in design?
The Design Scope outlines
the general aims and goals of the project design and lists the major deliverables and milestones
.
What does WBS include?
WBS is
a hierarchical and incremental decomposition of the project into phases, deliverables and work packages
. It is a tree structure, which shows a subdivision of effort required to achieve an objective; for example a program, project, and contract.
What is the correct order of the scope management processes?
Plan Scope Management:
Planning the process, and creating a scope management plan
. Collect Requirements: Defining and documenting the stakeholder’s needs. Define Scope: Developing a detailed project scope statement. Create WBS: Subdividing project deliverables into smaller work units.
Which is the first step in project planning?
Step 1:
Identify & Meet with Stakeholders
Make sure you identify all stakeholders and keep their interests in mind when creating your project plan. Meet with the project sponsors and key stakeholders to discuss their needs and project expectations, and establish a scope baseline, budget, and timeline.
What is the lowest level of the WBS?
The lowest level of the work breakdown structure is called
a work package
.