However, there is a thin line difference between the construction drawings and shop drawings. Where the shop drawings depict the original design of the building, the

construction drawings are modified from time to time

. They include the revisions a building has undergone whilst the construction process is underway.

What are construction drawings?

The term “construction drawings” refers to

the collection of final preconstruction drawings that represent the building as a whole

. … The winning contractor is bound by all of the contract documentation, including the construction drawings. Construction Drawings: Represent the building as a whole as designed.

What does shop drawings mean in construction?

A shop drawing is a

drawing or set of drawings produced by the contractor, supplier, manufacturer

, subcontractor, consultants, or fabricator. Shop drawings are typically required for prefabricated components. … The shop drawing normally shows more detail than the construction documents.

What do shop drawings include?

Ҥ 3.12. 1 Shop Drawings are

drawings, diagrams, schedules, and other data specially prepared for the Work by the Contractor or a Subcontractor, Sub-subcontractor, manufacturer, supplier

, or distributor to illustrate some portion of the Work.

What is the difference between construction drawings and specifications?

By definition, drawing notes that

describe materials, equipment, systems, standards, or workmanship are specifications

. And, though far less common, graphic images that appear on small paper are drawings. … Mechanical and electrical drawings (large paper) also frequently include specifications.

What are the 6 types of construction drawings?

  • Plans.
  • Interior and exterior elevations.
  • Building and wall sections.
  • Interior and exterior details.
  • Schedules and room finishes.
  • Framing and utility plans.

What is the purpose of a shop drawing?

The purpose of shop drawings is

to enable the design professional to secure graphic representation from the general contractor as

to how the installing contractor intends to complete a portion of the work, prior to proceeding, for which submittals are required.

What are the 5 basic components of construction drawings?

  • 1 Architectural Drawings: This is one of the types of construction drawings. …
  • Structural Drawings: …
  • Electrical Drawings: …
  • Plumbing and Sanitary Drawings: …
  • Finishing Drawing:

How many types of construction drawings are there?


42 Types

of Drawings Used in Building Design- Comprehensive Guide.

What are the types of drawings?

  • Pencil Drawing.
  • Color Pencil Drawing.
  • Charcoal Drawing.
  • Graphite Drawing.
  • Chalk Drawing.
  • Pen Drawing.
  • Ink Drawing.
  • Crayon Drawing.

Do shop drawings need to be stamped?

Shop drawings that are derived from seperate design drawings

need not be sealed and stamped by a design professional

. The design professionals retained by the Owner should not seal and sign the drawings prepared by the contractor.

Who prepares as built drawings?

Who Creates As-Built Drawings? Typically,

the architects or designers who originally designed the project

will also create the as-builts. They are familiar with the original specifications and are therefore the most qualified to reflect recorded changes.

What is the difference between IFC drawings and shop drawings?

Shop drawing is a drawing that is produced by the contractor, subcontractor, manufacturer, fabricator or the supplier whereas IFC (Issued for Construction) is a type of drawing issued to the contractor by the client or his/her representative. … Drawings are the cornerstone of every construction.

Do architects own their drawings?

Under copyright law, the architect who prepares architectural plans and drawings is

considered the author and owner of the copyright

in those plans or drawings, unless there is an agreement to the contrary.

Do specifications overrule drawings?

If there is a conflict between the Drawings and Details on Drawings and the Specifications,

then the Specifications will prevail

. The higher “Order of Precedence of Documents” governs or prevails.

Do I need construction drawings?

On some small or simple projects the work is straightforward enough not to need any further detailed construction information. … If the building is more complicated, the materials unusual or the work of very high standard, then

detailed construction drawings will be necessary

.